Stand Painted. Tank Drilled.
Drilling ... constant water, towel to catch the cut out, and the most important thing (after the drill and hole saw) - drill guide!
Cuts were a little rough on the other side, but not enough to worry about.
The all important water test (not that I had even 1% doubt!).
Stand and tank.
Thinking of sticking/attaching these three power boards up the side for nice easy access to switches etc.
Next step is to get the plumbing sorted, then it will be onto Operation Transfer.
Cuts were a little rough on the other side, but not enough to worry about.
The all important water test (not that I had even 1% doubt!).
Stand and tank.
Thinking of sticking/attaching these three power boards up the side for nice easy access to switches etc.
Next step is to get the plumbing sorted, then it will be onto Operation Transfer.